首页
施工方法
一、将铝合金或不锈钢框架埋入槽内,用水泥将底部抹平整,与铝合金框架底座成水平,地面坑位预留深度为23mm。
1、Embed aluminium alloy or stainless frame into the groove and smear the ground smoothly by the cement. The cement surface should be horizonta l with aluminium alloy frame base. The reserved depth of ground pit is 23mm
二、水泥晾干后将除尘地垫放入铝合金框架内。
2、After cement become dry, put the dedusting doormat into the aluminium alloy frame.